Powering Change for the AI Economy Through Integrated Circular Energy.

Hardware. Engineering. Capital. Software. One mission built for time-to-power.

[Data]
AI power demand growth
[Data]
Grid interconnection delays
[Data]
Megawatt scarcity
[Data]
Time-to-power economics

The future of compute belongs to those who can deliver reliable megawatts, fast.

TRIMAX Holdings is a multi-unit, circular energy platform built to solve the time-to-power bottleneck facing AI data centers, hyperscalers, and mission critical infrastructure. We integrate hardware, engineering, capital, and software into one unified system — accelerating deployment, strengthening uptime, and unlocking contracted, infrastructure-style returns.

Two Platforms.
One Mission.

TRIMAX Holdings develops and delivers dispatchable behind-the-meter power solutions for AI data centers, mission-critical facilities, utilities, and industrial customers through two complementary power infrastructure platforms designed to accelerate time-to-power and create long-term enterprise value.

GE aeroderivative gas turbines

Platform 1

Infrastructure Asset Redevelopment

TRIMAX acquires, decommissions, exports, refurbishes, repackages, and redeploys existing GE LM2500, LM6000, and Frame 6 gas turbine assets from global markets into North American power applications.

This platform monetizes underutilized industrial infrastructure, accelerates deployment timelines, and creates near-term cash flow opportunities while helping address growing demand for dispatchable generation capacity.

Execution Timeline

12–17 Months

Value Creation Process

  1. 1Global turbine sourcing
  2. 2Asset acquisition and technical due diligence
  3. 3Decommissioning and logistics management
  4. 4Refurbishment and repackaging
  5. 5Delivery, commissioning, and commercial deployment
TRIMAX T2500 mobile gas turbine generator on trailer

Platform 2

T2500 Aeroderivative Manufacturing Platform

TRIMAX converts CFM56-5B aircraft engines into proprietary T2500 natural-gas-fired aeroderivative power systems engineered for distributed generation, AI infrastructure, and mission-critical applications.

This platform creates long-term enterprise value through the production of proprietary power-generation systems designed to serve the rapidly expanding demand for distributed, dispatchable power.

Execution Timeline

12–17 Months

Value Creation Process

  1. 1Engine sourcing and intake evaluation
  2. 2Proprietary conversion and remanufacturing
  3. 3Natural gas system integration
  4. 4Testing and validation
  5. 5Final packaging and deployment

The TRIMAX Platform

  • TRIMAX Power Systems

    15 - 60 MW modular power systems that can be paralleled to provide 300-500 MW of onsite power generation for AI data centers.

  • TRIMAX Electric

    AI electrical engineering & campus development.

  • TRIMAX Capital

    Lease, EaaS, and captive finance programs.

  • TRIMAX Tek

    Software for customer acquisition, retention, and fleet optimization.

SAM.gov registered

A Disabled Veteran Owned enterprise with national competitiveness and industrial credibility.

Why Time-to-Power Matters

Asset-Level Impact

EBITDA delay

[Supporting copy pending]

System-Level Impact

Grid bottleneck

[Supporting copy pending]

Economy-Level Impact

GDP drag

[Supporting copy pending]

See How We Accelerate Time-to-Power
TRIMAX T2500 industrial gas turbine generator installed on site

Investor Perspective

By operating both an infrastructure asset redevelopment platform and a proprietary power-generation manufacturing platform, TRIMAX maintains multiple pathways to serve the accelerating demand for behind-the-meter power solutions.

The Infrastructure Asset Redevelopment Platform provides opportunities for near-term revenue generation, asset monetization, and balance-sheet growth. The T2500 Manufacturing Platform creates proprietary intellectual property, scalable production capacity, and long-term enterprise value through differentiated product development.

Together, these two business lines share similar execution timelines, leverage common engineering and operational capabilities, and support a unified mission:

Deliver reliable megawatts faster than traditional alternatives and help solve the time-to-power challenge facing the AI economy.
  • High-level IRR targets[TBD]
  • Contracted cash flows[TBD]
  • Circular energy model[TBD]